From design to install, and after.
Six stages, each one approved, scheduled and communicated, so you always know what's next.
- 6 stages
- Updates every week
- 2 rounds of design revisions included
What happens after you approve your estimate.
Your 10% payment on the rough estimate starts design. Here's every step from there.
-
01
Design & Renderings
We turn your Design Session into detailed drawings and renderings, so you can see your cabinets before they're built.
- 2 rounds of revisions are included. More are billed by the time they take.
- You give full approval before anything moves to engineering.
-
02
Engineering
We turn your approved design into exact plans for the shop team: every part, size and cut, so it's built right the first time.
- Appliance specs are needed before engineering starts.
-
03
Production
Your cabinets are built in our shop: milling, processing, then assembly, with an update from us every week.
- Typical production: kitchens 8 to 12 weeks, closets 3 to 8, built-ins 4 to 6, Murphy beds 3 to 6.
- Your exact timeline is set before production starts.
-
04
Delivery & Install
We deliver and install your cabinets. Doors and fronts stay off so your painter can finish them.
- Your countertop company templates after we install.
- Your painter finishes the cabinets, or we can recommend one of our painter trade partners.
- See how to get ready for install day.
-
05
Final Adjustments
Once your painter is done, we come back to hang doors and fronts, install hardware and fine-tune every gap, door and drawer.
Final 10% due after final adjustments -
06
Follow-Ups
We check in with a quick phone call at 30 days and again at 1 year to make sure everything works the way it should.
Four payments, tied to the work.
Each payment lines up with a stage, so you're never paying ahead of progress you can see.
- 10%Accept the estimateStarts design.
- 40%Approve the designCompletes your 50% down. Engineering and production begin.
- 40%Before installationNo install until this payment is made.
- 10%After final adjustmentsWhen everything is done.
Change orders are paid when you approve them. We accept check, ACH/bank transfer, Zelle and credit card. See how payments work
Getting ready for install.
A few things keep everyone safe and keep your install on schedule.
-
Clean and clear the spaceMove all furniture and valuables out of the work area. If we have to move things, there's a charge, or the install is rescheduled at additional cost.
-
Secure your petsDoors will be open during install, so keep pets safely away from the work area.
-
No kids in the work areaSharp tools are in use. It's for their safety and ours.
-
Put away valuablesAccidents are rare, but they happen. Anything you don't want at risk should be out of the way.
-
Install payment readyThe 40% install payment needs to be made before we start, or have a check ready.
You'll never have to chase us.
From design approval to the last follow-up call, you'll know where your project stands.
- Approval before every big stepDesign, scope and schedule are approved before work moves forward.
- An update every weekDuring production and install, you hear from us weekly.
- Prompt notice if anything changesIf the schedule shifts, you know right away, not after the fact.
Earn your review.
Every project is built to earn a positive review on Google and Facebook. At the end, we'll ask for one. Your honest feedback helps the next family trust us too.
Process questions.
How many design revisions are included?
Two rounds of revisions are included. Additional revisions are billed based on the time they take.
How long does production take?
Production on an average-size kitchen typically takes 8 to 12 weeks. Closets usually take 3 to 8 weeks, built-ins 4 to 6 weeks and Murphy beds 3 to 6 weeks. Your exact timeline is set before production starts.
How long does installation take?
Installing a kitchen usually takes 2 to 4 days. After your painter finishes, we come back to hang doors and fronts, install hardware and make final adjustments.
When are payments due?
10% when you accept the rough estimate, 40% when you approve the design, 40% before installation and the final 10% after final adjustments. Change orders are paid when you approve them.
Do you paint or stain the cabinets?
We deliver finish-ready cabinets and coordinate with your painter, or recommend one of our painter trade partners. After paint, we come back to hang doors and fronts and make final adjustments.

